Pipes instead of pumps
Where piped surface water would replace the most groundwater, weighted by how much damage sinking does there.
ScenarioA planning priority from your weights, not a prediction: ranking inside a city failed validation (file 12).
Map shows
Each layer colours the same 22 blocks. The 16 km validated split exists for one cell only (west and central Semarang), so it is quoted, not mapped.
Since Jan 2024 · 605 L/s · 47,261 connections by Sep 2024
Its supply is spread over West Semarang, Tugu and Ngaliyan by area (dashed amber blocks), because the service map is not public.
Validated 16 km cell (west and central Semarang): 27.9 / 43.8 / 54.7 Mm³ (P10/P50/P90)
22 blocks of 4 km, the grid of the demand model. Demand: AquiFair demand model (4 km Lead, 16 km Validated). Clay: soft-clay thickness layer. Supply: West Semarang SPAM service districts.